New projects & property in Mumbai

Compare new launches, under-construction and ready-to-move projects across Mumbai — prices, floor plans, RERA numbers and possession dates.

95Projects
33Localities
20Builders

About Mumbai

The Brihanmumbai Municipal Corporation (BMC) runs civic services for the island city and the western and eastern suburbs, divided into 24 administrative wards. It went to the polls on 15 January 2026, its first election since 2017. Regional planning and most large transport projects, including the metro network and the Atal Setu, are handled by the Mumbai Metropolitan Region Development Authority (MMRDA). Metro Line 3 was built by a separate state and central joint venture, Mumbai Metro Rail Corporation. Thane, Navi Mumbai, Mira-Bhayandar and Kalyan-Dombivli are separate municipal corporations with their own rules and tax bills.

The island city, from Colaba and Nariman Point up to Mahim and Sion, is the oldest and costliest part of the market. New supply there comes mostly from former mill land and redevelopment in Worli, Lower Parel, Prabhadevi, Byculla and Wadala, often as tall towers on small plots. In the western suburbs, Bandra, Khar and Juhu sit at the top end, and prices generally ease as you move north through Andheri, Goregaon, Malad, Kandivali, Borivali and Dahisar. The eastern suburbs run from Kurla and Chembur through Ghatkopar, Vikhroli and Powai to Mulund, with Powai and Chembur the most sought after. A large share of new flats across the suburbs comes from redevelopment of older housing societies and slum rehabilitation schemes, so carpet areas tend to be compact for the price and approvals deserve a careful read.

Office jobs are spread along a few clusters. Nariman Point and Fort still hold banks and government offices, while Lower Parel and Worli filled with office towers on old mill land. Bandra-Kurla Complex (BKC) houses the National Stock Exchange, bank headquarters and consulates. Further north are SEEPZ and the MIDC estate in Andheri East, the Hiranandani offices in Powai, business parks in Goregaon and Malad, and Vikhroli. The suburban railway still carries most commuters, and the Western and Eastern Express Highways are slow at peak hours.

Transport has changed a great deal in two years. Metro Line 3, the underground Aqua Line, has run the full distance from Aarey to Cuffe Parade since 9 October 2025, linking Colaba, Worli, BKC and the domestic and international terminals of the airport. Lines 2A and 7 have served the western suburbs since January 2023, and in 2026 short first stretches of Line 9 (Dahisar East to Kashigaon) and Line 2B (Mandale to Chembur) opened. The Coastal Road from Marine Lines to the Bandra-Worli Sea Link opened in stages from March 2024, and the Atal Setu to Navi Mumbai opened on 12 January 2024. Navi Mumbai International Airport began commercial flights on 25 December 2025, giving the region a second airport.

Before paying a booking amount, check the project on the MahaRERA website and match its registration number with the QR code that must appear on every advertisement. In BMC limits, stamp duty is 6 per cent of the agreement value or the ready reckoner value, whichever is higher, which includes a 1 per cent metro cess. A woman buying in her own name pays 1 per cent less, and the registration fee is capped at ₹30,000.

  • The BMC governs the island city and suburbs; MMRDA plans the wider region and builds most metro lines
  • BMC elections were held on 15 January 2026, the first since 2017
  • Metro Line 3 has run from Aarey to Cuffe Parade since 9 October 2025
  • The Atal Setu to Navi Mumbai opened on 12 January 2024
  • Navi Mumbai International Airport began commercial flights on 25 December 2025
  • Stamp duty in BMC limits is 6 per cent including metro cess, or 5 per cent for women buying in their own name

Infrastructure & connectivity

  • Metro Line 3 (Aqua Line), Aarey to Cuffe ParadeOperationalA 33.5 km underground line built by Mumbai Metro Rail Corporation. It opened from Aarey to BKC on 7 October 2024, to Acharya Atre Chowk in Worli on 10 May 2025 and through to Cuffe Parade on 9 October 2025.
  • Metro Lines 2A and 7 (Yellow and Red Lines)OperationalLine 2A (Dahisar to Andheri West along Link Road) and Line 7 (Dahisar East to Gundavali along the Western Express Highway) opened in part on 2 April 2022 and in full on 19 January 2023.
  • Metro Line 2B, DN Nagar to MandaleUnder constructionThe eastern end has opened in two steps: Mandale to Diamond Garden on 8 April 2026 and on to Chembur on 13 August 2026. The rest of the line towards Kurla, BKC and DN Nagar is still being built.
  • Metro Line 9, Dahisar East to KashigaonOperationalThe first 4.7 km stretch, from Dahisar East to Kashigaon in Mira Road, opened on 8 April 2026, extending the Line 7 corridor into Mira-Bhayandar.
  • Metro Line 4 and 4A, Wadala to Kasarvadavali and GaimukhUnder constructionRuns along LBS Marg and Eastern Express Highway to Thane. The first 10.5 km, Gaimukh to Cadbury Junction, received RDSO certification on 2 June 2026, and MMRDA was aiming to open it around Diwali or by the end of 2026, subject to CMRS approval.
  • Mumbai Coastal Road (south), Marine Lines to Bandra-Worli Sea LinkOperationalThe BMC's 10.58 km road opened in stages from 11 March 2024. The northern extension from Bandra towards Kandivali is under construction.
  • Atal Setu (Mumbai Trans Harbour Link)OperationalOpened on 12 January 2024, the sea bridge links Sewri in Mumbai with Chirle near Ulwe in Navi Mumbai. Cars paid a ₹200 one-way toll at opening.
  • Navi Mumbai International AirportOperationalInaugurated on 8 October 2025, with commercial flights from 25 December 2025. The first phase can handle 20 million passengers a year, and international flights began in July 2026.

Mumbai property FAQs

How much stamp duty will I pay on a flat in Mumbai?

In BMC limits the total is 6 per cent: 5 per cent stamp duty and a 1 per cent metro cess. It is charged on the agreement value or the ready reckoner value, whichever is higher. A woman buying in her own name pays 1 per cent less, and the registration fee is 1 per cent, capped at ₹30,000.

How do I check a project's MahaRERA registration?

Search the project by name or registration number at maharera.maharashtra.gov.in. The project page shows the promoter, the completion date committed to MahaRERA, approvals and quarterly progress. Every advertisement must carry the registration number and a QR code that links to this page, so scan it and check the details match.

Which areas have the easiest commute to BKC?

Metro Line 3 now reaches BKC from both directions, from Aarey, Marol and Sahar Road in the north and from Worli, Dadar and South Mumbai in the south. By road, Bandra, Kalina, Santacruz East, Kurla and Chembur are close, and the Santacruz-Chembur Link Road connects the eastern suburbs.

Is it risky to buy in a redevelopment project?

Redevelopment is a large part of Mumbai's new supply. Check that the project is registered with MahaRERA, that the building has its IOD and commencement certificate for the floors being sold, and that existing members have been rehoused or are being paid rent. Delays usually come from disputes among existing residents or approval changes, so read the quarterly updates on the MahaRERA page.

When will Metro Line 4 open?

Only the first section, Gaimukh to Cadbury Junction in Thane, is close to opening. MMRDA was aiming for around Diwali or the end of 2026, subject to CMRS approval. The stretch into Mumbai along LBS Marg to Wadala will open later.